This i a very important component in a tube well construction. selection of an end cap not only effects on the pipe installation times but also the overall life of a well. While constructing a tube well, one end cap is required to be connected to the bottom of the first pipe loawered in the well. This cap prevents the entry of sand and silt into the well from its bottom apart from making a way for pipe to go down easily. We at Jains have the wide range of End caps suitable for different pipe diametrs installed at different depths into the well.